Sinotrans Chengdu Qingbaijiang Cold Chain Logistics Park project is located in Chengdu International Railway Port, which is China's No.1 comprehensive cold chain supply chain platform enterprise. Chengdu Qingbaijiang Cold Chain Logistics Park is the fulcrum project of its layout in Southwest China and plays an important role in its nationwide operation network. With a total investment of RMB 800 million and an area of about 152 acres, the project will build an automated cold chain warehousing and distribution centre, a central processing centre, and a global procurement and distribution centre. The project provides cold chain e-commerce enterprises with "warehouse, dry and distribution integration" cold chain logistics network services, import and export cold chain services and supply chain services, accelerating the integrated development of logistics and trade in the railway port.
The first phase of Sinotrans Cold Chain Logistics Project consists of two cold storage buildings, one comprehensive building and other supporting facilities. "The two warehouses under construction are cold storage, No.1 warehouse is a single storey warehouse and No.2 warehouse is a double storey warehouse. There is a difference between the temperature zones of the two warehouses, and the items to be stored in the future are also different," said Chen Jun, the project leader, after the completion of the main coverage of the supply of cold-chain fresh food in the Southwest region.
Warehousing and logistics centre is a necessary part of every manufacturing enterprise. Whether it is self-owned warehouse or commissioned third-party logistics company, the daily throughput of goods and weight bearing transfer to the storage logistics centre of the floor put forward a high standard requirements.
The cold chain logistics warehousing floor in addition to withstand the heavy machinery, three-dimensional stacking of heavy pressure, the strong impact of the goods landing, but also long-term resistance to low temperature. Sinotrans Chengdu Qingbaijiang Cold Chain Logistics Park project, the highest requirement for the level of the floor is not less than FF100/FL60, the project used SpecPlate 110SS wear-resistant aggregate and sodium-based sealer SpecHard, whether it is the floor wear resistance, compression resistance, low-temperature resistance, and aesthetics have been significantly improved, to meet the requirements of the cold chain logistics floor.