The construction of the Beijing Municipal Administrative Center (BMAC) is proposed to adjust the spatial pattern of Beijing, manage the big city disease, and expand the new space for development, as well as to promote the synergistic development of Beijing-Tianjin-Hebei and explore the optimal development mode of the densely populated and economic areas. The planning scope is the former Tongzhou New Town planning and construction area, with a total area of about 155 square kilometres. The peripheral control area, namely, the whole area of Tongzhou is about 906 square kilometres, which in turn radiates and drives the synergistic development of Langfang Beisanxian area.
It is reported that the second phase of the administrative office area office plots include two major clusters: the southeast cluster of four bids and two bids in the village of Liuhe. The construction of the second phase of the administrative office area is an important prerequisite to ensure the relocation of the second batch of municipal authorities.
The project started on 1 September 2023, lasted 81 days and was officially completed on 20 November 2023, construction area: 30,000 m², garage flooring material selection of SpecChem Cementitious Self-Levelling System.
The stability and excellent fluidity of the self-levelling material of SpecChem Cementitious Self-Levelling Commercial Flooring System ensures the high flatness and durability of the flooring, while the natural texture of the material can be easily and harmoniously presented with other elements in the overall space, which provides the designers with the overall effect of simple, natural and durable, which is in line with the new concept of contemporary design.