Beijing Anzhen Hospital Parking Building Upgrade Flooring Project

2024-07-19 10:57

Beijing Anzhen Hospital affiliated to Capital Medical University was established in April 1984, together with Beijing Institute of Cardiopulmonary and Vascular Diseases and Beijing Institute of Cardiopulmonary and Vascular Diseases Combined with Traditional Chinese and Western Medicines, as an all-round consortium.

Anzhen Hospital is a tertiary general hospital with medical treatment, teaching, scientific research, prevention and international exchange, focusing on the treatment of cardiopulmonary and vascular diseases, and is a leader in the cardiovascular field in China. It is one of the first National Clinical Cardiovascular Disease Research Centres, and has a national and Beijing Clinical Specimen Resource Bank for cardiovascular diseases in accordance with international standards (ISBER), and it is one of the first medical institutions to obtain qualification for the diagnosis and treatment of organ transplants. It is one of the first medical institutions to obtain the qualification of organ transplantation diagnosis and treatment.

Problems of the original garage: 1. driveway area peeling, shedding, grass-roots sand, cracks; 2. garage floor grey puffing, dim environment; 3. garage floor large cracks and low strength; 4. car ramp epoxy anti-skid sand shedding and poor aesthetics.


Solution:

■ Driveway ground The original wheel stalls, speed bumps, road studs and other artificial demolition. With a milling machine to the old ground all knocked out, the concrete ground cracks, loose parts of the groove, remove the loose parts. Finally, repair the ground with repair mortar, and then use SpecChem surface cement self-levelling + polyurethane cover floor process for construction, increase the surface wear resistance and strength, after the completion of the carriageway ground a new look.

■ Ramp floor In order to ensure the anti-slip ramp has strong adhesion, need to use the milling machine to remove the loose part of the original ground, and then use Specbeh's acrylic non-vibration non-slip ramp system SpecLane for the construction of the ramp, after the completion of the ramp has a high degree of aesthetics and a long service life.


1.png


2.png


3.jpg



4.png



5.png